Cross-Connecting High Pressure Gas Pipeline Poland – Slovakia

Contractor: JV DÚHA, a.s.- MANTOVANI SpA
Construction time: 7/2018 – 10/2020
Tender price part Nr.2: 25,8 mil. EUR

Row start: KS01 Veľké Kapušany
Row end: TU 43 – Chlmec
Total lengh: 103 km
Part nr.2 lengh – LČ2: 52,5 Km
Diameter: DN 1024
Pipe material: oceľ L485ME
Maximum pressure: 7.25 MPa(g) (KS01 V.Kapušany – HPS Výrava, 8,4 MPa(g) (HPS Výrava – štátna hranica, k.ú. Palota)
Capacity direction: SK-PL 5,7 mld. Nm3/rok (pri 101,325 kPa a 0°C)

Prezentation